If you are a user of the Smart tunnel, it was closed for a few days last week after the tunnel was used to clear up flood water.It was closed on the 22nd of March and only re-opened yesterday the 26th of March. It takes the tunnel about 4 days to be re-opened after being used.
The excuse story :
ode I occurs when there is no rain or light rain, while Mode II is when there is moderate rain requiring water to be diverted through the tunnel’s lower channel without requiring the motorway to be closed.
Mode III is when the rainfall is heavy enough to require the tunnel’s closure.
During the closure, water had to be pumped out, the 3km motorway physically cleaned and all electrical equipment and systems checked to ensure they were working well.
Only after all this will the Malaysian Highway Authority approve its reopening
4 days?? How much did this tunnel cost us again? Smart but very slow eh!